Insights

Browse CAP Logistics analysis, updates, and logistics intelligence in one index.

Aircraft maintenance and urgent aviation parts logistics planning
Aug 06, 2026

Before the AOG Call Comes: Build a Parts-Logistics Response Plan That Cuts Recovery Delays

An aircraft-on-ground event is unscheduled by definition, but the logistics response should not be improvised. The fastest recoveries usually depend less on finding a carrier at midnight than on wo...

AOG response plan aircraft on ground logistics AOG parts shipping aviation MRO logistics next flight out aircraft parts air charter AOG 8130-3 documentation AOG customs planning aircraft parts logistics
Heavy haul truck moving an oversized industrial load on a permitted route
Aug 05, 2026

Why Similar Oversize Loads Can Have Very Different Lead Times

Two oversized shipments can look almost interchangeable at origin and still arrive on very different schedules. The reason is usually not truck availability alone. It is permit classification. In t...

superload permit requirements oversize load permits by state heavy haul lead time escort vehicle requirements oversize load curfews route survey heavy haul permit planning
Industrial maintenance shipment with hazardous materials paperwork and packaged components ready for expedited transport
Aug 04, 2026

Urgent Hazmat Shipments: Why Expedited Moves Stall and What to Catch on the First Call

A line-down recovery move can unravel in minutes when the replacement part, chemical, or battery module is booked as ordinary expedite freight and only later identified as regulated hazardous mater...

hazmat expedited freight shipping dangerous goods urgently hazmat carrier requirements hazardous materials safety permit urgent chemical shipment hazmat shipping papers undeclared dangerous goods industrial maintenance logistics manufacturing downtime recovery